Chelsea SW5 < Back

London SW5 Chimney Lining

The property was undergoing a high-end refurbishment, and many of the flues were unfit for use. The clients called Greystone Chimneys indicating that they wished to retain use of open fires, and to install a solid fuel stove, using a solution that would mean that the flues would remain serviceable for the foreseeable future.

Thermo-setting resin liners and Thermocrete B2 refractory castable flue liners were chosen as the best solution. Cross-sectional area of flue was retained, allowing for a maximum possible opening size for the open fireplaces, and Thermocrete was used to afford a strong, insulated solution for the solid fuel stove application. The installation of 4 flues was carried out over 2 days with minimum fuss and disruption, with the site being left clean and tidy.